nuclear power plants

Change in sediments of hydraulic structures during unloading of the system of water cooling of nuclear power plants

During the period from July to November 1985, three cycles of measurements of sediments of hydraulic engineering structures of Blocks 1 and 2 were carried out at the Rovenskoye NPP according to the methodology set forth in [1, 2]. The measurements are performed by high-precision leveling in a constant circuit [2]. Three cycles of measurements consisted of four level moves between three deep benchmarks for sediment marks of the unit pump station (NPS), pumping station of cooling towers (NSG), two high-altitude cooling towers (G1 and G2).

Features of regularization of the territory of 30-kilometers zone of nuclear power plants (on the example of Khmelnitsky NPP)

In-process grounded concept of sanitary-hygienic and area of supervision of AES, investigational influence of factors of environment on migration of radionuklides in soils and recommendations are resulted for equipping with modern amenities of territories of  environment of the AES