power-generating unit

Switching 300 MW Power-Generating Units with Gas-and-Oil-Fired Boilers to Increased Load Mode

The goal of the research is to develop the guidelines for increasing the capacity of the operating 300 MW power-generating units by using the allowances assumed at the design computations and manufacture of the power-generating equipment, while preserving its reliability criteria and performance efficiency. The capacity of the operating power-generating units is increased in three stages.