Improvement of 6/10 kV Distribution Power Networks Efficiency
The study focuses on the ways to improve the operation efficiency of 6 kV and 10 kV distribution power networks on the example of the Horodok District Power Network, Lvivoblenergo PJSC (Ukraine). The main drawbacks of these power networks are the poor condition of the electrical equipment and great length and insufficient transmission capacity of the existing 6/10 kV power transmission lines.