Construction in an existing building usually increases the time required to organize and perform process operations. The paper analyzes the existing methods for evaluating compressibility for various regulatory documents and their relationship with the conditions of the construction site and surrounding buildings, shows the need to systematize approaches to compressibility evaluation and develop appropriate design recommendations.
Based on theoretical research, the author concludes that there is a need to formulate the terms "compact construction conditions" or "conditions of dense housing"; to compile a list of compressibility conditions and their classification, grouping in order to identify the impact of each group on the cost and duration of construction and installation works; to develop a general procedure for assessing the compressibility of work conditions (indicator) and the necessary measures depending on its quantitative value.
Cherednychenko T., Tukharely V., Snehyrev D. (2018). Napravlennost sovremennoho stroytelstva - zastroika horodov v stesnennykh uslovyiakh. Ynzhenernyi vestnyk Dona, 1. ivdon.ru/ru/magazine/archive/n1y2018/4743 (in Russian)
Belchevskyi R. (2020) Organizational and technological preparation for construction of objects in restricted conditions. Innovatsii i investytsii». Vol. 5. https://cyberleninka.ru/article/n/organizatsionno-tehnologicheskaya-podg... (in Russian).
Schwabe K., Jochen Teizer J., Konig M. (2019) Applying rule-based model-checking to construction site layout planning tasks. Automation in Construction, Vol. 97, Pp 205-219. https://doi.org/10.1016/j.autcon.2018.10.012.
https://doi.org/10.1016/j.autcon.2018.10.012
Zavari M., Shahhosseini V., Ardeshir A., Seb M. (2022) Multi-objective optimization of dynamic construction site layout using BIM and GIS. Journal of Building Engineering. Vol. 52. https://doi.org/10.1016/j.jobe.2022.104518.
https://doi.org/10.1016/j.jobe.2022.104518
Yi W., Chi H-L., Wang S. (2018) Mathematical programming models for construction site layout problems. Automation in Construction, Vol. 85, Pp 241-248. https://doi.org/10.1016/j.autcon.2017.10.031.
https://doi.org/10.1016/j.autcon.2017.10.031
Xu M., Nie X., Li H., Cheng J., Mei Z. (2022) Smart construction sites: A promising approach to improving on-site HSE management performance. Journal of Building Engineering. Vol. 49. https://doi.org/10.1016/j.jobe.2022.104007.
https://doi.org/10.1016/j.jobe.2022.104007
Znamenskyi V., Chuniuk D., Morozov E. (2012). Ustroistvo ohrazhdaiushchykh system kotlovanov v stesnennykh horodskykh uslovyiakh. Zhylyshchnoe stroytelstvo, 9, 60-63. https://cyberleninka.ru/article/n/ustroystvo-ograzhdayuschih-sistem-kotl... (in Russian)
Chebanova S. Burlachenko O. Polyakov V. (2018) Orhanyzatsyonno-tekhnolohycheskye reshenyia stroytelstva v stesnennykh horodskykh uslovyiakh. Inzhenernyj vestnik Dona, 1. ivdon.ru/ru/magazine/archive/n1y2018/4802 (in Russian)
Gaido A.N. (2017) Development of work execution design for construction of pile foundations in constrained city conditions. Bulletin of PNRPU. Construction and Architecture. 2017. Vol. 8, no. 4. Pp. 74-85. DOI: 10.15593/2224-9826/2017.4.08 (in Ukrainian)
https://doi.org/10.15593/2224-9826/2017.4.08
Mudryi I., Vybranets Y. (2021). The principle of molding object organizational and technological schemes of the plant. Suchasni tekhnolohii ta metody rozrakhunkiv u budivnytstvi, 16, 109-114,DOI: https://doi.org/10.36910/6775-2410-6208-2021-6(16)-14
https://doi.org/10.36910/6775-2410-6208-2021-6(16)-14
Dorosh. A. (2011). Orhanizatsiia budivelnoho vyrobnytstva. ISBN № 978-966-2007-16-9 (in Ukrainian)
Sedov D. (2010). Factors of constraint in conditions of dense urban development. Vestnyk MHSU, 4. 171-174, https://cyberleninka.ru/article/n/faktory-stesnennosti-v-usloviyah-plotn... (in Russian)
Mudryy I., Ivaneyko I. (2022). The use of small drilling equipment in the arrangement of pile foundations in compressed conditions. Intellectual Archive. 11. 112-117. http://www.intellectualarchive.com/?link=item&id=2737
https://doi.org/10.32370/IA_2022_09_11
Ivaneiko I. (2021). Construction of prefabricated foundations in complex excavation sites. Suchasni tekhnolohii ta metody rozrakhunkiv u budivnytstvi, 16, 53-61. https://doi.org/10.36910/6775-2410-6208-2021-6(16)-07 (in Ukrainian).
https://doi.org/10.36910/6775-2410-6208-2021-6(16)-07
Hryhorovskyi P. Nadtochii M. (2010). Vplyv umov ushchilnenosti zabudovy na vartist ta trudomistkist sporudzhennia zhytlovykh budynkiv. Novi tekhnolohii v budivnytstvi. 1. (19), 82-84. http://www.ntinbuilding.ndibv.org.ua/archive/2010/19/17.pdf (in Ukrainian).