pit

ERECTION OF FOUNDATION-BASEMENT PART OF UNDERGROUND STRUCTURES IN WATER-SATURATED SOILS OF ODESSA REGION

According to the General Plan of the city's perspective development, it is planned to develop the territories of the irrigation fields and the adjoining dam. The article details the engineering tasks of erecting the foundation-basement construction of underground structures considering the geological and hydrogeological conditions of the low-lying area of the Odessa region. Features of occurrence and genesis of low-lying part sites have been elaborated. The paper also elucidates the methods of orientation employed and water lowering during the erection of underground structures.