non-rhythmic flow-lines

SYSTEM OF REDISTRIBUTION OF NON-USED RESOURCE WORK IN NON-RHYTHMIC FLOW-LINES

The article proposes to reduce the duration of non-rhythmic flow lines on technologically identical processes by using the resource of «flow-line non-critical» divisions on interdependent works.

In non-rhythmic flow-line construction, there are processes with a reserve of non-used resources with adjacent works («flow-line non-rhythmic» works). As a result of the system study, it is proposed to characterize «flow-line non-critical» works as having an increased period of deployment or convolution of flow lines.

OPTIMIZATION OF DEPLOYMENT PERIODS OF NON-RHYTHMIC FLOW-LINES BY COMPLEX MECHANIZED MACHINES

The article proposes to balance processes with non-rhythmic flow-lines according to the period of work execution with the use of complex mechanized machines (CMM).

An increase in the period of deployment in the flow-line and downtime of non-critical works calculated by the Critical Path Method requires the development of optimization methods to reduce the construction period. We proposed a hypothesis to equalize work rhythms due to the redistribution of work volumes on interdependent divisions (ID) between CMMs.