optimization of flow-lines deployment periods

OPTIMIZATION OF DEPLOYMENT PERIODS OF NON-RHYTHMIC FLOW-LINES BY COMPLEX MECHANIZED MACHINES

The article proposes to balance processes with non-rhythmic flow-lines according to the period of work execution with the use of complex mechanized machines (CMM).

An increase in the period of deployment in the flow-line and downtime of non-critical works calculated by the Critical Path Method requires the development of optimization methods to reduce the construction period. We proposed a hypothesis to equalize work rhythms due to the redistribution of work volumes on interdependent divisions (ID) between CMMs.