Planning of hard coal underground mining operations in the aspect of GIS tools

1
Silesian University of Technology
2
Silesian University of Technology

Purpose. This article will discuss the general problems in planning hard coal underground mining operations. The conditions of Upper Silesian Coal Basin perfectly illustrate the complexity of that process. The exemplary concept modern IT Production Management System will be shown.  of. The multitude of data contained in the central database allows to take a full advantage of the capabilities of GIS tools that permit fast spatial visualization of the coal deposit and efficiently manage multiple tasks of planning of the mining operations. Methodology. The build-concept of integrated IT Production Management System, which will presented in a very general way, was inspired by results of a detailed inspection of the example of a similar system developed for a mining company in the Upper Silesian Coal Basin in relation to PRINCE2 standards. Results. The benefits of this type of modern solution are particularly evident when planning mining operations in complex, multi-plant mining companies. By taking full advantage of the capabilities of GIS tools it is possible to look at the hard coal deposit from a much wider perspective than with a single mining plant, which improves the rational mining economy. Scientific novelty and practical significance. Presented concept of the build of integrated IT Production Management System allows quickly create multi-variant hard coal deposit development projects, taking into account all the factors that limit the output of the deposit. The system allows the flow of information between dependent business areas and for data to be stored in one place without duplication. The data collected in a central database exemplifies the full advantage of the capabilities of GIS tools in the complex process of planning of production.

1. Bielecka E. Systemy Informacji Geograficznej – teoria i zastosowania, Wydawnictwo PJWSTK, Warszawa, 2006.
2. Bradley K.: "Ken Bradley's understanding PRINCE2", SPOCE Project Management Ltd, 2002, England. ISBN 978-1902192000.
3. Główny Urząd Statystyczny. "Ochrona środowiska 2013". Warszawa, 2013, p. 133. ISSN 0867-3217.
4. Hamrin, H.: "Underground mining methods and applications". W. A. Hustrulid, R. L. Bullock, eds. Underground Mining Meth- ods: Engineering Fundamentals and International Case Studies. SME, Littleton, 2001, CO, 3–14.
5. Hejmanowski R., Malinowska A. "Building damage risk assessment on mining terrains in Poland with GlS application". International Journal of Rock Mechanics & Mining Sciences; ISSN 1365-1609, 2010, vol. 47 no. 2, pp. 238–245.
6. Jelonek I., Poniewiera M., Gąsior B. "Budowa jakościowego modelu złoża na przykładzie jego wdrażania w Kompanii Węglowej S.A. Cz. 3, Generowanie raportów na podstawie NMZ". Documenta Geonica. 2015/1, pp. 65–69.
7. Kowalski A. "Deformacje powierzchni w Górnośląskim Zagłębiu Węglowym". Wydawnictwo naukowe GIG, Katowice, 2015.
8. Proceedings of the 4th Domestic Conference "Security and protection of buildings in the mining areas", Karpacz, Poland, 2013.
9. Poniewiera M. Zastosowanie oprogramowania GeoLisp do budowy dynamicznego systemu informacji o przestrzeni górniczej. Górnictwo zrównoważonego rozwoju, 2016. Konferencja naukowa, Gliwice. 2016, p. 69.
10. Poniewiera M., Sikora P.: "Konwersja map numerycznych". Zeszyty Naukowe Politechniki Śl. nr 1752, s. Górnictwo z. 278, Gliwice, 2007, pptr. 377–383. ISSN 0372-9508.
11. Poniewiera M., Sokoła-Szewioła V. "GIS systems in Polish coal mining", Innovative technologies in mining and transport. Katowice, Poland, 2014, pp. 71–105.
12. Tauron Wydobycie S.A. "Koncepcja Informatycznego Systemu Zarządzania Produkcją". Unpublished material, 2015.
13. http://www.oracle.com/technetwork/database-options/spatialandgraph/overv.... Oracle Corporation's official website.