TO THE QUESTIONNAIRE OF THE OPERATING CONDITION OF SPAN CONSTRUCTIONS OF ROAD BRIDGES IN WESTERN AREAS OF UKRAINE

2018;
: 123-126
1
Lviv Politechnic National University, Departament of Roads and Bridges
2
Motor road colledge

By using the examples of large – scale inspections of iron – concrete bridges the defects and damaqes of elements, the degradation of structural materials are shown. The examples of structure imperfection, tipical defects, operation drawbacks are illustrated. Construction defects are the most numerous and can significantly affect the operational reliability and durability of the surveyed bridges. Basically it is: departure from the project, use of substandard materials and violation of production technology; their share accounts for 55 % of the surveyed bridges. It is shown that the degree of influence of cracks on the bearing capacity and durability spans depending on their location, character, width and size of disclosure under temporary stress. The main danger of all detected cracks is that they are not controlled by the calculation, and this can
lead to an unplanned overload of the reinforcement and an uncounted crack opening. It is established that a considerable part of surveyed structures works under load in the calculated mode. However, in some runways, there may be more dangerous situations that threaten the lowering of the load capacity of runways. The part of bridges in “4” and “5” operating conditions increases year by year, which indicates a decrease in the reliability of bridge structures. There is an accumulation of volumes of repair works that have not been performed in previous years. The task is to develop criteria for assessing the effectiveness of bridge repairs repairs with limited residual resources, as well as developing rational reinforcement schemes for structures located on high load highway traffic routes.

1. Bodnar L. P. , Panibratets L. K. , Zagorodniy S. S., Chursin O. P. Suchasnyi instrument upravlinnia mostamy [A modern brush management tool]. Road industry of Ukraine. No. 4: “Informatvodor” LLC. [In Ukrainian].

2. S. Yu. Tseplov, M. F. (2016) Gavryshchuk Yak vriatuvaty mosty starozhyly? Problemy ta perspektyvy rozvytku mostovoho kompleksu Ukrainy [How to save the bridges of the old-timers? Problems and prospects of the bridge complex of Ukraine]. Road industry of Ukraine. No.

3: LLC “Ukrinforia-AvtoDor”. [In Ukrainian]. 3. Luchko Y. Y., Koval P. M., Korniev M. M., Lantuch-Lyashenko A. I., Kharhalis M. R. (2005) Mosty: Konstruktsii ta nadiinist [Bridges: Constructions and reliability]. Lviv, Kamenyar. [In Ukrainian].

4. DBN В.2.3.- 22: 2009. (2009) Sporudy transportu. Mosty ta truby. Osnovni vymohy proektuvannia. [Construction facilities. Bridges and pipes. Basic design requirements]. Km Ministry of Regional Development and Construction of Ukraine. [In Ukrainian].

5. DBN В.2.3. – 6: 2009. (2009) Mosty ta truby. Obstezhennia i vyprobuvannia. [Bridges and pipes. Inspection and testing]. Kiev. Ministry of Regional Development and Construction of Ukraine [In Ukrainian].